ES EN
Tell us your project

New builds — Marina Alta

New-build homes in Jávea, Moraira and the Marina Alta

From plot to keys with one studio: the team that designs your house is the team that builds it. Design, permit, construction and interiors — one contact, in your language.

Tell us about your plot
3D image of a project under construction, always labelled as a render. Never presented as built work
Render — project under construction

Before you buy the plot

What a “for sale” sign won’t tell you.

Not every plot allows the house you imagine. Before designing — and, if you want, before you buy — we study what can really be built and put it in writing. The report costs €1,500 + VAT.

Buildable area

How many m² can really be built on that plot — not what the listing claims.

Footprint and setbacks

How much ground the house may occupy and how far it must sit from boundaries and roads.

Urban or rustic land?

On rustic land the rules change completely: minimum plot size, permitted uses, different timings.

Coastal restrictions

Near the sea another law rules. We check whether the coastal strip affects your plot.

Flood zoning

The flood map is checked before signing, not after. We check it for you.

A written report

All of the above in one clear document, before the deposit. Worth more than any render.

Ask for the report

Exactly what is included

Plot study

A real planning report: what can be built, how much and under which conditions.

Full architectural project

Concept, basic and execution project. The whole house designed by the team that will build it.

Permit and paperwork

We prepare the file to pass first time and defend it at your town hall.

Construction under our direction

One contract, one responsible party: trusted crews, our standard, a visible schedule.

Interior design

Materials, lighting, joinery, home automation and furniture decided with the build, not after it.

Handover and aftercare

Keys, home manual and warranty. We stay on the phone after you move in.

How it works and how long it takes

A new build is not a renovation: in the middle sits a municipal permit that takes 8-12 months in this comarca. We won’t hide it — we’ll show you what we do with it.

Month 1

Plot and preliminary study

Planning report and first concept. If you haven’t bought yet, this step saves you the expensive mistake.

2-4 months

Concept and basic project

The house is designed whole. The basic project is what applies for the permit. The timing depends mostly on the changes you make to the design along the way.

8-12 months

Municipal permit

The comarca’s wait. We file it and defend it ourselves; exact timing depends on the municipality.

During the wait

Execution and interiors

Execution drawings, materials, interiors and the final budget are closed while the town hall reviews.

12-18 months

Construction under our direction

Building with a visible schedule and weekly photos, wherever you live.

Final month

Handover

Snagging, home manual, warranty and keys.

What it costs

€2,500 – €3,000 /m²

New-build cost moves mostly with the plot, the built area and the finishes. After the plot study and concept design you get an honest approximate figure.

What moves the price

  • Slope and access of the plot
  • Built area and basements
  • Finishes, joinery and installations
  • Pool, exteriors and site works

Projects under construction

Houses designed, with permits on their way. What you see are project renders, labelled as such — photography will come with the build.

sections of the house, palm trees and pool
Render — project under construction
See the project →

House among pines

Calpe · under construction · 2026

section of the house stepping down the hillside
Render — project under construction
See the project →

Hillside house

Calpe · under construction · 2026

Frequently asked questions

How much does it cost to build a house in the Marina Alta?

As a guide, a new build starts at around €2,500/m² and can reach €3,000/m² depending on plot, built area and finishes. After the plot study and concept design we give you an honest figure for your case.

How long does it take to build a house from scratch?

You have to count the design, the permit and the build. In a new build you do have to wait for the town hall permit, which in this comarca takes around 8-12 months. We prepare the project so it passes first time and no months are lost to incomplete paperwork.

Can I start building before the permit is granted?

Not in a new build. In a full renovation you can, by having the project certified by an independent body. Be wary of anyone who promises otherwise for a new build.

What can I build on my plot?

It depends on the land classification, the buildable area, the maximum footprint and the setbacks — and in this comarca also on coastal or flood-zone restrictions. It is the first thing we check, and it is worth doing before buying the plot.

Can you build on rustic land?

Sometimes, under very different conditions from urban land: minimum plot size, permitted uses and its own procedures. We study it case by case before promising anything.

Can I build without living in Spain?

Yes — it is our most common case. Weekly photos and video, video calls and every decision in writing with its cost, in your language.

And this is what we hand over

This is how we design. This is how we finish.

Renders are promises; finished works are proof. These homes and spaces are already lived in — same studio, same crew that will build yours.

See all projects →

Tell us about your plot

Do you own it, or are you about to buy? Five fields and we reply within 48 hours with the next step to find out what can really be built.

We reply within 48 hours.